Commercial electrical fit-outs: what to settle before the trades arrive

A fit-out puts electrical, mechanical and security work on the same ceiling grid against a fixed lease date. Here is what to settle at scoping stage, and what to require before the builder leaves.

Electrician installing an LED ceiling panel in a commercial office

A commercial electrical fit-out is the one project where electrical, mechanical and security work all land in the same few weeks, on the same ceiling grid, against a lease date that will not move. The drawings show partitions and finishes. What they rarely show is whether the existing board can carry the new load, where the exit signs end up once the walls go in, or who holds the paperwork when the builder leaves.

Most of the trouble is decided before anyone picks up a tool. The questions below are worth settling at scoping stage, whether you are a tenant taking a floor, a property manager handing over a tenancy, or a facility manager who will maintain the result.

Start at the switchboard, not the floor plan

The first question is not where the power points go. It is what the distribution board has left to give: the spare ways available, the condition of the protective devices, and whether the board can be worked on safely while the rest of the building keeps trading. All three need establishing on site, not assuming from a drawing.

Then add up what the fit-out is asking for – workstation density, a staff kitchen, a comms room, extra air conditioning, increasingly EV charging in the basement. If the board is close to capacity, a switchboard upgrade becomes the long-lead item for the whole programme, because it can involve the network operator and a planned outage. Found at design stage, that is a scheduling decision. Found during installation, it is a delay with a lease date attached.

Sub-metering and who gets billed for what

Fit-outs are where tenancy boundaries blur: a tenancy light and power circuit fed from a common-area board, after-hours air conditioning with no way to attribute run time, a tenant’s comms room cooling on the landlord’s supply. Decide at design stage which loads are tenancy, which are base-building, and how each is measured. Retrofitting metering into an occupied tenancy means another shutdown.

Lighting is easy; the controls are where it goes wrong

Installing LED panels into a new ceiling grid is the predictable part. The controls are not. The common fault is switching zones inherited from the old layout, so one switch covers half an open-plan area and a closed meeting room, and lighting one office at night means lighting the whole floor.

  • Ask for a lighting control schedule mapping switches, sensors and zones against the final partition layout
  • Confirm which luminaires sit on emergency circuits and which do not
  • Decide where occupancy sensing genuinely helps, and make sure dimming can be adjusted by someone other than the installer

Emergency and exit lighting move when the walls move

This is the most commonly missed item in a tenancy fit-out. New partitions change the paths of travel through a floor, which changes where exit signage must be visible and where emergency luminaires need to give coverage. An arrangement that was compliant before the fit-out is not automatically compliant after it.

It also reaches beyond the tenancy. Where a building has a fire safety schedule, emergency and exit lighting is typically listed among its fire safety measures. Fire and Rescue NSW explains that the owner of a building having a fire safety schedule must give a copy of the fire safety statement to the Commissioner, and that an annual statement says each essential fire safety measure in it has been assessed by an accredited practitioner (fire safety). A fit-out that quietly relocates exit signs can therefore surface as a problem in the next statement, long after the builder has gone.

Air does not follow partitions

Mechanical services are designed around a layout, and fit-outs change the layout. Air that worked across an open floor ends up with one zone starved and another over-cooled, a thermostat stranded in a meeting room that now governs a whole area, and return paths blocked by full-height partitions.

Where units are relocated, added or taken out of service, refrigerant work is involved. The Australian Refrigeration Council states that a refrigerant handling licence is required for installing, commissioning, servicing or maintaining refrigeration and air conditioning equipment, and for decommissioning equipment containing refrigerant. Eclipse holds ARC refrigerant trading authorisation AU35479. Worth asking who on the fit-out is doing that work, and under whose authorisation.

Security at the new boundary

A fit-out redraws who may go where, and the hardware has to follow. Readers, electric strikes and door controllers need coordinating with the builder’s door schedule before the doors are ordered, because a glazed door with no provision for a strike is an expensive thing to discover on site. Access control and intercom changes also need a decision about credentials: who issues them, who removes them when a staff member leaves, and whether the new system will talk to whatever the base building uses at the lobby. Camera coverage needs the same look over, since new walls create blind spots.

Cabling, and who is allowed to install it

Structured cabling carries far more than computers now, so specify it properly rather than fitting it into whatever ceiling space is left over. The ACMA requires that to work as a cabler in Australia you must be registered, that an unregistered cabler may work only under proper supervision, and that cabling advice forms be provided to customers after each job. Ask for those forms at handover. The specification side is covered in our guide to commercial data cabling.

Strip-out: what is above the ceiling

Demolition is where a fit-out meets the building’s history: abandoned cabling, circuits still live despite serving nothing, and fixings in materials nobody has identified. SafeWork NSW sets out that the person with management or control of a workplace must ensure an asbestos register is prepared and kept at the workplace, with an exemption only where the building was constructed after 31 December 2003, no asbestos has been identified, and none is likely to be present. Where asbestos has been identified, a written management plan is required, and it must be accessible to any worker or business intending to carry out work there – so have it ready before the trades arrive.

What to require at practical completion

The documentation is what you are left maintaining, and easier to obtain while money is still owed. NSW Government guidance states that by law any electrical wiring work must be done by, or supervised by, a licensed electrician, and that whoever carries out the electrical test must submit a Certificate of Compliance for Electrical Work no later than seven days after the test. Since 1 July 2026 those certificates go through the BCNSW eCert portal. Alongside it, ask for:

  • An as-installed board schedule, and legible circuit labelling that matches it
  • The lighting control schedule, with zones and sensor settings as commissioned
  • Cabling test results and the cabling advice forms
  • Administrator credentials for access control, intercom and cameras, issued to the building rather than kept by the installer
  • Operation and maintenance manuals, with model and serial numbers
  • Confirmation of how any affected fire safety measures were addressed

None of this requires technical knowledge to ask for. It is a short list of questions put before the first wall goes up, and it decides whether the tenancy absorbs the next change of use or has to be opened up again.

Next steps

If you have a fit-out coming up and cannot say what spare capacity the board has, or who will hold the compliance paperwork afterwards, that is the place to begin. Eclipse covers the electrical, mechanical and security scopes together, which closes most of the coordination gaps above – see our commercial electrical services. Our office hours are Monday to Friday, 7am to 5:30pm, and we offer after-hours call-outs for commercial and industrial sites. Call Eclipse on (02) 9832 9871 or send us your site details.

Before you sign off a fit-out

  • Confirm the spare ways and condition of the board before the layout is finalised
  • Decide which loads are tenancy and which are base-building, and how they are metered
  • Have exit signage and emergency lighting reassessed against the new paths of travel
  • Coordinate readers and electric strikes with the builder's door schedule before doors are ordered
  • Ask for the asbestos register and management plan before any ceiling or riser is opened
  • Collect the CCEW, board schedule, cabling test results and administrator credentials at completion

General information only. Requirements change and depend on your site, so confirm specifics with your certifier or insurer, or ask us.

FAQ

Frequently asked questions

Something else on your mind? Call (02) 9832 9871 and talk it through with us.

What should a commercial electrical fit-out include?

Beyond outlets and lighting, it should account for the spare capacity of the existing distribution board, tenancy metering, lighting control zones that match the final partition layout, emergency and exit lighting reassessed against the new paths of travel, mechanical zoning, access control and camera changes, structured cabling, and a defined set of handover documents. The documentation is the part most often left out.

Does a fit-out change the exit lighting?

If the partitions change the paths of travel through a floor, exit signage and emergency lighting coverage need reassessing, because an arrangement that was compliant before the work is not automatically compliant after it. Where the building has a fire safety schedule, emergency and exit lighting is usually listed among its fire safety measures, so the change can also affect the building's annual fire safety statement.

Who issues the electrical compliance paperwork after a fit-out?

Whoever carries out the electrical test. NSW Government guidance states that electrical wiring work must be done by, or supervised by, a licensed electrician, and that the tester must submit a Certificate of Compliance for Electrical Work no later than seven days after the test, through the BCNSW eCert portal. Ask for a copy as part of handover.

What usually causes delays in a fit-out?

Board capacity found too late. If the existing distribution board has no usable spare ways, or the protective devices need replacing, an upgrade can involve the network operator and a planned outage, which makes it the longest lead item in the programme. Checking it during design turns it into a scheduling decision rather than a delay.

Can one contractor cover the electrical, mechanical and security scopes?

Yes, and it closes the coordination gaps that cause most fit-out rework: door hardware ordered without provision for an electric strike, a thermostat left governing the wrong area, cabling installed with no spare capacity. Eclipse covers commercial and industrial electrical, mechanical and security work on the same site, with after-hours call-outs available.

Keep reading

More from the blog

All articles

Request a quote

Tell us about the job.

Send the basics and we'll call you back to scope it. Site down after hours? Call us: after-hours call-outs are available for commercial and industrial sites.

    By sending this form you agree to our privacy policy.

    Call now Get a quote